60秒动态视频在线观看|女生越喊男生越要塞视频|天美传媒免费观看MV天美网|坐在学长的棒子上写作业作文视频|快播资讯首页|男生女生一起做差差差很痛的APP大全下载|欧美色图28p

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site