60秒动态视频在线观看|女生越喊男生越要塞视频|天美传媒免费观看MV天美网|坐在学长的棒子上写作业作文视频|快播资讯首页|男生女生一起做差差差很痛的APP大全下载|欧美色图28p

News

Pipe designed by Hilong Holdings Limited has been used in the Sulige gas field

Date 2011-06-10

In May 2011, the 50672 drilling team of Chuanqing Drilling & Exploration Corp has completed the drilling activity at the Su5-3-16H1 well located at the Sulige gas field. The four-inch drill pipe designed by Hilong Holdings Limited has been used in the drilling. After completion of the drilling, the horizontal section of the drill well reached 2606 meters long, setting a record for the longest onshore horizontal drilling well in China. This achievement has once again demonstrated in action the outstanding performance and leading technology of Hilong’s drill pipe products.